News & Announcements
Mayor Reed Gusciora and Trenton Water Works Expand Walk-In Customer Service Hours
TRENTON, N.J. — Mayor W. Reed Gusciora and Trenton Water Works (TWW) today announced expanded walk-in customer service hours at TWW’s Administrative Office, located at 333 Cortland Street (off Mulberry Street) in Trenton, to provide customers with greater access to
TWW System Status Updates: 02/14/26
On behalf of Sean Semple, Director of the City of Trenton’s Department of Water and Sewer, and Taya Brown-Humphrey, Water Treatment Plant Superintendent, I am providing an update on the status of the Trenton Water Works (TWW) system and the
TWW System Status Updates: 02/13/26
Statement from Sean Semple, Director, City of Trenton Department of Water and Sewer, Regarding Trenton Water Works and the Pennington Avenue Reservoir Recent reporting has raised questions about the status of Trenton Water Works (TWW) and the Pennington Avenue Reservoir.
Trenton Water Works Launches New Phases of Lead Service Line Replacements
Trenton, N.J. — Trenton Water Works (TWW) announced today that, through the public contracting process, it has selected two vendors—Roman E&G and Dewcon, Inc.—to remove approximately 2,000 lead service lines from its distribution system and private homes in Trenton, Ewing
TWW Takes Interim Measures While Independent Engineers Review Raw Water Intake Performance
Trenton, NJ — Trenton Water Works (TWW) announced today that it will deploy three high-capacity pumps at its Route 29 South water filtration plant as a precautionary, interim measure to ensure uninterrupted water service to more than 200,000 customers across

Protecting Our Residents From Lead Is a Top Priority
On Tuesday, December 3, TWW will begin a phased rollout of our corrosion control project, introducing orthophosphate, a food additive, into our water-treatment process.

Protecting Our Residents From Lead Is a Top Priority
On Tuesday, December 3, TWW will begin a phased rollout of our corrosion control project, introducing orthophosphate, a food additive, into our water-treatment process.

Protecting Our Residents From Lead Is a Top Priority
On Tuesday, December 3, TWW will begin a phased rollout of our corrosion control project, introducing orthophosphate, a food additive, into our water-treatment process.


